Start with the existing roof build-up
A flat roof proposal should explain what is beneath the visible waterproofing. Ask how the contractor will assess the deck, existing coverings and insulation, including areas that cannot be established by a visual inspection. Identify any previous surveys or repairs you already know about. The important distinction is between confirmed information and assumptions that may change the scope once the roof is opened. A quote should explain how unexpected findings will be reported and approved.
Roof outlets, parapets, rooflights, upstands and adjoining roofs are part of the project scope. Mark their positions on any plans you hold and explain where water has appeared inside. Do not assume the internal stain identifies the entry point. Ask how the proposal addresses falls, drainage routes and transitions to retained sections. Where plant or other equipment is present, identify who is responsible for disconnecting, moving or reinstating it if required.
Read the commercial flat roof replacement service guide →